Wednesday, October 27, 2010

Subject Translation Project

DUE: NOVEMBER 12, 2010

Here is a list of everything due for this project:

• Conceptual Drawings (30-40)
- Notes and brain storming roughs
• Contour/Structure Line (2-3)
- Spread (2-3)
• Continuous Tone with ink wash or charcoal (2-3)
• Graphic Translation
- Line Only (2-3)
- Line and Shape (5 min.)
- Shape Only (5 min.)
• Final Image in square format (5 min.)
• Final Project (poster, brochure or flip book)
• RESEARCH

Please see me with any questions.

Thank you,
Matt

Wednesday, October 20, 2010

Due Friday, October 22

Hello everyone -

Remember, this Friday, the color photo grids are due. You should be turning in two of each of the three types of grids:
1. size change
2. scale change
3. size and scale change with overlap

Also, on Monday, October 25, anyone that is reworking some of their Point, Line and Plane Project, that needs to be turned in.

See you Friday.

Matt

Thursday, October 14, 2010

Been awhile . . .

For Friday, October 15, have your contour/structure line drawings done. Be ready to start (if you haven't already) the continuous tone drawings.

Color grid projects are due Friday, October 22 at the beginning of class. Remember to have thumbnails smaller and next to the final composition.

See you Friday.