Wednesday, October 27, 2010

Subject Translation Project

DUE: NOVEMBER 12, 2010

Here is a list of everything due for this project:

• Conceptual Drawings (30-40)
- Notes and brain storming roughs
• Contour/Structure Line (2-3)
- Spread (2-3)
• Continuous Tone with ink wash or charcoal (2-3)
• Graphic Translation
- Line Only (2-3)
- Line and Shape (5 min.)
- Shape Only (5 min.)
• Final Image in square format (5 min.)
• Final Project (poster, brochure or flip book)
• RESEARCH

Please see me with any questions.

Thank you,
Matt

No comments:

Post a Comment